Copy of E.I.N. DESIGNATED AS A FULL DEPTH CONCRETE ROADWAY THAT MUST BE RESTORED IN KIND AS PER DOT STANDARD SPECIFICATION #1042A&B. For conditions that need immediate attention from the permittee, NYC DOT may issue Priority CARs [AKA Notices of Immediate Corrective Action (NICAs)]. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. BEFORE WORK, MUST COORDINATE AND OBTAIN APPROVAL FROM NYSDOT 9A EIC. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. View the, Applicants must obtain all applicable original permits and/or approvals from any other governmental agencies prior to applying for a permit. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). Non-Freeway, Special, DOT SIGNALS APPROVED PLANS. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island Brooklyn, NY 11215 16 Court Street, 7th Fl. These are in addition to the "Common Requirements" listed at the beginning of this section. Exceptions include, Ribbon sidewalks are appropriate in R1-R6 zoning districts; full sidewalks are used elsewhere, Sidewalks should be as wide as possible appropriate to foot traffic and available street width, Sidewalks should always be provided on both sides of the street, A parks internal path located near a roadway does not substitute for a sidewalk, If the sidewalk is more than 25 feet wide, there should be a clear path adjacent to the building line and an 8-foot clear path adjacent to the curbside furnishing zone. Tel: (718) 482-4516 Staten Island, NY 10301 While Davit and Round poles are also standard poles, cost comparisons to the SS refer to the Octagonal. IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. Kew Gardens, NY 11415 5. The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. The second permit for canopy maintenance is automatically placed on a. WORK 9 PM TO 6 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH TO TRAFFIC WHEN SITE IS UNATTENDED. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. All other inquiries: (212) 748-6610 THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. At that point, OCMC executive staff will determine if additional permit stipulations are required. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Any work is subject to suspension during an NYC DOT-issued. The applicant must maintain valid insurance and a canopy maintenance permit as long as the canopy exists. NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. FULL BLOCK SEGMENT RESTORATION IS REQUIRED FOR THE LENGTH OF THE ROADWAY CURB TO CURB. The Queens borough permit office is located in Queens Borough Hall. New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015). SUPERINTENDENT OF HIGHWAY OPERATIONS (ASHO) OFFICE & OCMC-STREETS IN WRITING NO LATER THAN 48-HOURS PRIOR TO COMPLETION OF PAVING. (212) 839-8856, The Bronx (212) 839-2480 If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. Some permit types can also be processed at the relevant borough office. Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). View the most recent version of Drawing #H1029 of the NYC DOT. FIXED SIGN MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. Office hours: 8:30 AM-4:30 PM, Staten Island ON STIP WAGE02), WORK NORTHBOUND 7AM-4PM M-F AND 9AM-6PM SAT/SUN. Drawings (Downloads) Standard Sheets - Metric - SI; Standard Sheets - English - USC; REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. WORK SATURDAY AND SUNDAY. Once the canopy is installed, the canopy installer or authorized agent must contact the HIQA borough office for a final inspection to determine whether the installed canopy conforms to the submitted plans. West 120-55 Queens Blvd., Room 201 HIQA may also inspect emergency street openings/excavations and utility access cover openings. New York, NY 10038 Chapter 4 describes the processes for executing work in the streets, after permits and approvals are obtained, and the enforcement actions NYC DOT may take to safeguard city streets. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. Only in circumstances where the applicant can demonstrate that the work could not have been reasonably anticipated prior to the street resurfacing/reconstruction will an application for a Street Opening Permit on a Protected Street be reviewed. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Office hours: Applications accepted, only from 8:30 AM to 12:30 PM; 59 Maiden Lane, 37th floor 3030 Third Avenue In addition, the streets serve as the access point for the subsurface infrastructure that provides water, sewer, power, and telecommunications services for the city. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. This New York 811 marking shows where a cable television line is located beneath the sidewalk. For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. Deleted or Superseded Standard Sheet documents are accessible through the links in the second table below. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. (212) 839-2475 POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. Fax: (718) 858-0069, Manhattan Sidewalk GradesUnless granted a waiver from NYC DOT, permanent sidewalks must be laid to the legal curb grades. Applications for NYC DOT vault permits are reviewed on a case-by-case basis. Staten Island, NY 10301 Permits are available for various types of work, including Street Opening Permits, Building Operations/Construction Activity Permits, and Sidewalk Construction Permits. DOT currently specifies 3000 Kelvin as the color temperature for all luminaires. The protected streets layer is current as of the previous business day. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. Fax: 212-720-3488, Queens Tel: (718) 430-1877, Brooklyn If the insurance is not current, the request will be denied. Bronx, NY 10461 Brooklyn AS A CONDITION OF THIS PERMIT A CONSTRUCTION MANAGER FAMILIAR WITH THIS PROJECT IS REQUIRED TO ATTEND WEEKLY TUESDAY MEETINGS AT 115 BROADWAY 5TH FL OF THE L.M.C.C.C. See the most recent version of Drawing # H1029 of the NYC DOT. Fax: 718-556-7305, The Bronx Download a PDF of theGlossary and Appendicesfor offline access to the Resources section. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Tel: (718) 993-6110 Kew Gardens, NY 11424 A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. Your permit(s) must be reviewed and released by the OCMC Office. If the applicant plans to construct a new vault or enlarge an existing vault, PEU will refer the applicant to NYC DOT's Office of Franchises, Concessions and Revocable Consents for a vault license. Brooklyn Transverse SlopeSidewalks must be laid to pitch from the building line toward the curb. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. Costs: Shown for each pole or luminaire as a $ symbol, representing relative costs compared to the Standard Street Light (SSL), the Octagonal Pole. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Unauthorized removal of muni-meters is prohibited. Canopy authorizations and permits are required to place a canopy over the sidewalk. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. THE CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE THE FINAL RESTORATION STARTS SO THAT HIQA CAN MONITOR THE WORK. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. NYCStreets system will automatically block an applicant from submission if insurance is not current. Queens THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. Applicants must submit a completed permit application. All of these signs are metal and include the agency name and sign code. POSITIONING OF TRAFFIC SIGNS (TOTAL OF . NO WORK CAN OCCUR WITHIN 2 BLOCKS OF AN ACTIVELY OPERATING NYCDDC SITE. 22 Reade Street, 6th Fl. A CITYBENCH IS/WILL BE LOCATED ON THIS STREET. Questions regarding permit registration or application processes can be directed to any Permit Office. Minimum slopes should be used wherever possible. Street Opening Permits are required for excavations or other work in a city street that disturbs the street surface. All other inquiries: (718) 222-7207 The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. 811 or 800-272-4480. MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. Form must be notarized. Special Notice: This edition was finalized before the state of emergency due to COVID-19; as city processes adapt in response to the crisis, they may temporarily differ from the guidance provided here. Check all types of work that will be performed by the applicant or his/her corporation. Bronx, NY 10457 MAINTAIN ONE 12 FOOT LANE FOR LOCAL AND EMERGENCY ACCESS AT ALL TIMES, PLACE BARRICADES AND POST SIGNS MEETING "FEDERAL MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)" STANDARDS STATING "ROAD CLOSED TO THROUGH TRAFFIC", MAINTAIN 2 LANES FOR TRAFFIC, 1 LANE IN EACH DIRECTION, MAINTAIN 4 LANES FOR TRAFFIC, 2 LANES IN EACH DIRECTION. 75 Park Place, 9th Floor NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. There are two categories of HIQA holds: Holds for Specific Permit Type or Unique Street Treatment and Holds that May Be Placed on the Permittee. WORK HOURS 9 PM TO 5 AM. In addition to the application procedures for the four categories of permit types, there are some situations or street conditions that require special procedures. For Holds: (718) 222-7231 Manhole Embargo, Commercial Refuse Container, Temporary Plates and Shunts, Steam Tanks and Nitrogen Tanks permits are processed and stipulated directly by NYCSTREET. AREAS WHERE THE MINIMUM CANNOT BE ACHIEVED, CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM THE DEPARTMENT. New York, NY 10013 NOTE: This list of permit stipulations is provided as a reference tool, for informational purposes only. ANY STORAGE OF MATERIAL OR STORAGE OF EQUIPMENT REQUIRES A SEPARATE PERMIT. OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. New York, NY 10007 The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. COORDINATE CONSTRUCTION ACTIVITY WITH THEATRE GROUPS PRIOR TO WORK. CTDOT_Traffic . Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. If no changes are required, the permit will be released. Five types are relevant to the citys street lights: I, II, III, IV, and V. Standard Street Light: Standard pole (Octagonal) with LED Cobra Head luminaire. A statement that the canopy design and construction conforms to NYC DOT Standard Details of Construction. The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. See Section 3.5.1 Holds for more information. AN EMBARGO WILL BE IN EFFECT FOR THIS AREA SATURDAY AUGUST 2, 9 AND 16 FROM 12:01AM TO 6:00PM. An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. Contact information can be found in Appendix C, NYC DOT Contact Information. BETWEEN THE HOURS OF 12:01AM AND 6:00AM. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. To request release of a Revenue hold, the permittee must contact NYC DOT's Fiscal Affairs Office to arrange for payment of outstanding bills. In this case, upon request of the permittee, NYC DOT will provide an opportunity to object to the permit revocation within five days after the request is received by NYC DOT. A permit is required for new sidewalk installation, repairs, and replacements. Further information is available in Section 2-02 (h) of the Highway Rules. PEU also accepts applications to abandon existing vaults that are no longer in use. AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. NYC Parks & Recreation A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. For further information regarding fees, the applicant should refer to Section 2-03 of the Highway Rules. 55 Water Street, Concourse Level PROVIDE 5 FEET FOR PEDESTRIANS ON SIDEWALK OR IN CURB LANE. City Hall, 3rd Floor Permittees can use these maps to make informed decisions while planning new projects. For Further Information: THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. Sidewalk Construction Permits apply to any repairs, replacements or new sidewalk installations.